Timing Analysis

After place & route with nextpnr, the extension reports timing information.

Metrics

MetricMeaning
Pre-Routing FrequencyEstimated FMax before routing — optimistic upper bound
Max FrequencyActual FMax after routing — the real achievable clock speed
Critical Path DelayThe longest combinational path in nanoseconds
Constraints MetWhether the design meets the target frequency

The routing overhead (difference between pre-routing and post-routing frequency) is typically 15–30% and is normal.

Target Frequency

The frequency nextpnr is constrained against comes from the Clash manifest, which states everything needed: which top-entity ports are clocks, which domain each one is in, and every domain’s period. A top entity whose clock port is in Dom50 (period: 20000 ps) is placed and routed against 50 MHz, passed as --freq.

This is deliberately not a setting. The target is a property of the entity being synthesized — two top entities in one workspace can run at different frequencies, and the manifest already states both.

Nothing is guessed around, because the number becomes a verdict: a frequency belonging to some other part of the design would have place & route report constraints met about a constraint the design never had. So:

The manifest saysWhat happens
One clock domain across the top entity’s clock portsThat domain’s period is the target
No clock ports at allNo --freq — nextpnr reports an unconstrained Fmax, which is what a combinational design has
Clock ports in two or more domainsPlace & route stops, naming each clock and its frequency. One --freq covers the whole design, so no single number can be met by both
A clock port with no domain, a domain the manifest never defines, or a domain without a usable periodThe manifest is rejected when parsed — it disagrees with itself

For a multi-clock design, synthesis and elaboration still work normally; it is only place & route that has nothing to constrain against.

Resource Utilization

The extension also reports resource utilization after place & route:

  • LUTs — Look-up tables used vs. total available
  • Registers — Flip-flops used vs. total
  • BRAM — Block RAM tiles used vs. total
  • IO — IO pins used vs. total

All values include usage percentages.